-
Distribution, Network Rehabilitation And Expansion In Surulere
The Works include; Extension of the existing distribution network with HDPE pipes
-
Distribution, Network Rehabilitation And Expansion In Itire Zone
Increase water supply capacity from 210 million gallons per day to 745 million gallons per day
-
Construction of Ilesa Water Distribution, Lot 2
Supply, Butt-fused and lay a total of 168.70km of PE100 pipes (63mm-315mm ) and fittings including Tees, reducers and end-caps, PE 100 valves, fire hydrants etc.