OVERVIEW

Main objectives/Goals were:

  • – Increase water production capacity and try to avoid problems of daily water cuts
  • – Guarantee the supply of drinking water to the growing population of Lagos (Nigeria)
  • – Increase water supply capacity from 210 million gallons/day to 745 million gallons/day

 

Main Functions / Tasks developed were Design checking and works supervision for:

  • – Replacement of concrete and cast-iron pipes 110mm HD pipes with a total length of 19.990,52 meters
  • – Extension of the existing pipes distribution network with HDPE Pipes (Total 29,651.36 meters ) of diameters
    • 110mm – 9,952.63 meters
    • 160mm – 8,854.19 meters
    • 200mm – 10,699.20 meters
    • 250mm – 145.36 meters
  • – Installation of a DN 500mm new battery-powered electromagnetic meters.
  • – Installation of 6.000 pre-paid ND 20mm meters for domestic water.
  • – Installation of 180 ND 50 mm pre-paid industrial bulk meters.
  • – Installation of 474 ND 110mm to ND 400 mm isolation valves
  • – Installation of 30 fire hydrants.
  • – Installation of 49.642 meters of metallic guidewire.

- CONSTRUCTION PROJECTS

PROJECT DETAILS

Categories:
Client: Lagos State Government
Location: Itire Zone - Lagos
Surface Area: 29.65km
Completed: 2018
Value: $7,253,324.75