OVERVIEW

Main objectives/Goals were:

  • – Increase water production capacity and try to avoid problems of daily water cuts
  • – Guarantee the supply of drinking water to the growing population of Lagos (Nigeria)
  • – Increase water supply capacity from 210 million gallons/day to 745 million gallons/day

 

Main Functions / Tasks developed were Design checking and works supervision for:

  • – Extension of the existing pipes distribution network with HDPE Pipes of diameters 110mm, 160mm, 200mm, 250, and 315mmmm. Total length 38.942m:
    • 110mm – 12,515 meters
    • 160mm – 10,585 meters
    • 200mm – 5,784 meters
    • 250mm – 6,796 meters
    • 315mm – 3,262 meters
  • – Installation of two (2) DN 500mm electromagnetic meters powered by an ultra-sonic battery.
  • – Installation of 2.000 pre-paid ND 20mm meters for domestic water.
  • – Installation of 50 ND 50 mm industrial bulk meters.
  • – Installation of 389 ND 110mm to ND 400 mm isolation valves
  • – Installation of 54 fire hydrants
  • – Installation of 38.942 meters of a metallic guide wire

- CONSTRUCTION PROJECTS

PROJECT DETAILS

Categories:
Client: Lagos State Government
Location: Surulere - Lagos
Surface Area: 38.942 Km
Completed: 2018
Value: $6,549,070.88